⚡ 24/7 Emergency+1 (800) 555-0199

Project Portfolio

Real Projects, Real Outcomes

Browse our completed projects to see how we solve complex electrical challenges across homes and businesses.

Service:
Property:

⭐ Featured Project

Challenge: A 1,800 sq ft historic home with original knob-and-tube wiring was a fire hazard and failed to meet insurance requirements.

Solution: Full rewire with modern copper wiring, 200A panel upgrade, AFCI breakers throughout, and preservation-compliant installation methods.

100% code compliance, insurance approval, and a 40% reduction in electrical incidents.

Springfield

Location

Residential Wiring

Category

Residential

Property

8 days

Duration

Residential WiringResidential
⏱ 8 days

Full Rewire of 1920s Historic Home in Springfield

Challenge: A 1,800 sq ft historic home with original knob-and-tube wiring was a fire hazard and failed to meet insurance requirements.

Solution: Full rewire with modern copper wiring, 200A panel upgrade, AFCI breakers throughout, and preservation-compliant installation methods.

100% code compliance, insurance approval, and a 40% reduction in electrical incidents.

📍 Springfield
Commercial ElectricalCommercial
⏱ 12 days

4,000 sq ft Office Electrical Fit-Out

Challenge: A fast-growing tech firm needed a full electrical fit-out for a leased office, including server room, 40 workstations and conference AV.

Solution: Dedicated server room circuit with redundant UPS paths, structured wiring, LED lighting controls, and 80 individual circuits.

Delivered 3 days ahead of schedule. Zero punch list items after final inspection.

📍 Capital City
EV Charger InstallationCommercial
⏱ 5 days

Multi-Bay EV Charging Station for Auto Dealership

Challenge: An auto dealership needed 12 Level 2 EV chargers across their lot within a tight 5-day window before a manufacturer audit.

Solution: Panel upgrade to 400A service, trenching, conduit installation, and 12 smart charger deployments with fleet management software integration.

Passed manufacturer audit. Dealership reports $8,000/month savings vs. outsourced charging.

📍 Shelbyville
Generator InstallationCommercial
⏱ 6 days

Whole-Facility Generator Backup for Medical Clinic

Challenge: A busy medical clinic required compliant backup power with automatic transfer in under 10 seconds for life-safety systems.

Solution: 100kW natural gas generator, automatic transfer switch, load-shedding logic, and quarterly maintenance plan.

Passed state health department electrical inspection. Zero patient impact during two outages since installation.

📍 Springfield

Have a Similar Project?

Get a free quote today. Fast response, transparent pricing, guaranteed work.