The Problem
A busy medical clinic required compliant backup power with automatic transfer in under 10 seconds for life-safety systems.
Our Solution
100kW natural gas generator, automatic transfer switch, load-shedding logic, and quarterly maintenance plan.
Project Timeline
- 1
Assessment
Site survey, load calculation, and permit research completed within 24 hours.
- 2
Planning
Detailed scope document and fixed-price quote issued and approved by client.
- 3
Installation
Licensed crew on site. All work performed to NEC code with daily progress updates.
- 4
Inspection
Authority-having-jurisdiction (AHJ) inspection passed first time.
- 5
Handover
System test with client. Documentation and warranty issued.
Materials & Standards
- Copper conductors (NEC compliant)
- Listed breaker panels and breakers
- AFCI/GFCI devices as required
- Conduit and fittings
- Approved junction boxes and covers
Outcome
Passed state health department electrical inspection. Zero patient impact during two outages since installation.
Related Services
Generator Installation
Whole-home and commercial generator installation with automatic transfer switches.
Commercial Electrical
Full commercial electrical services — tenant fit-outs, lighting design, power distribution.