The Problem
A fast-growing tech firm needed a full electrical fit-out for a leased office, including server room, 40 workstations and conference AV.
Our Solution
Dedicated server room circuit with redundant UPS paths, structured wiring, LED lighting controls, and 80 individual circuits.
Project Timeline
- 1
Assessment
Site survey, load calculation, and permit research completed within 24 hours.
- 2
Planning
Detailed scope document and fixed-price quote issued and approved by client.
- 3
Installation
Licensed crew on site. All work performed to NEC code with daily progress updates.
- 4
Inspection
Authority-having-jurisdiction (AHJ) inspection passed first time.
- 5
Handover
System test with client. Documentation and warranty issued.
Materials & Standards
- Copper conductors (NEC compliant)
- Listed breaker panels and breakers
- AFCI/GFCI devices as required
- Conduit and fittings
- Approved junction boxes and covers
Outcome
Delivered 3 days ahead of schedule. Zero punch list items after final inspection.